things have been a little slow with this, i've bought a supra so have been busy working on that in my spare time, it's now off to the bodyshop for a full respray so i've now got some available time to push this thing forward
6 boost going on, had to chop down a few studs underneath the same as the last time
new o ring and refreshed oil filter housing on, however i'll be using a smaller 2jz ge one for space as i need to run two sandwich plates for stuff now
gtx3582r t3 twin scroll turbo goes on
turbo smart wastegates ready to have v bands welded on
vibratechnics 'drift' mounts going on
degreed the cams in as per brian crower spec sheet
new intake manifold arrived, 90mm throttle body, top feed fuel rail conversion, all o ring seals and looks pretty
i'll be able to start supplying these on demand for around £620 delivered within the uk too which is cool
also dumped the engine in the bay for now as i needed the space in the corner for something else, i'll have it back out to put the gearbox on properly as i couldn't get it lined up with the twin disc clutch
more pics later
grade 7 copper bkr7e plugs in for initial start/run in
will change to iridium grade 8's during mapping