Once I got it in it was time to do some wiring I found that I only had to wire up about 6 or 7 wires to get it to fire up
After about 2 hours of wiring it started up on the first crank I was really happy to hear it start the motor it self has about 75k miles I had the valve covers off and they were really clean so I am happy about that.
once everything was in I ran into a few problem first who ever had the car before me cross threaded all the trans mounting cross member bolts so I had to drill them out and heal a coil them.
Once that was all fixxed my shifter was about a inch and a half forward of where it need to be. keep in mind they do make a kit to fix this problem they have a longer shifter housing and shifter rod I think 2jz swap makes it and its about 400 dollars I may be off on that price. so what I did was I ordered a 1jz shifter housing and rod that gave me about a half inch back and for the other inch i heated the shifter and reshaped it.