stripping the Z down to nothing this week. Then next week, drilling out hundreds of spot welds to remove the engine tubbing, speaker/storage area behind the seats, and any brackets that aren't needed (glad Vince is willing to help me out with that hah)...then she leaves for Fab work (cage, stitch weld, bracing, motor/trans mounts, unboltable radiator support, bash bars, ect) (may be a break in updates till she gets back from that but hopefully not)
- all the electronics have been ordered through Touge Factory and will hopefully be here in the next couple weeks.
- driveline setup has all been ordered through Full Spec Moto.
__________________
https://instagram.com/eck_matthew/
Last edited by Imarvin240; 11-21-2011 at 01:15 AM..
|