Dropped the front tubs off but holdups with other jobs ment they weren't able to be started on till later that weekend. They were done by Monday ready to be picked up. Pretty happy with the fitment they basically dropped straight in when the standard tub was cut out. There is a small area where the top of the kelway tub meets the tower could have been slightly longer for a better fit. Overall they're excellent though very happy with them!
Chop chop
Chop chop
Drop in, easy az bro
Motherloads of space!
The end result is going to look 10x cleaner, smooth and phat =)
Good shot of how much higher and bigger they actually are...
Couldnt wait to get it all back and pull the subframes out got some things planned for them too. =)